? Agosto 2, 2020 (Domingo)
? 8:00 AM – 6:00 PM
HINUNGDAN ??
? Replacement of corroded tower suspension insulator strings
? Installation of additional intermediary structure type HA to correct low conductor to ground clearance
? Ride-on maintenance for the replacement of rotten wooden poles and corroded SLWT of 8 structures comprising of 12 steel poles and the replacement of corroded phase ABC suspension insulator strings of 19 structures
APEKTADONG LUGAR ??
✅ Entiro coverage area nan SURNECO.
Alang sa inyong kasayuran.
Daghang Salamat!
(Source: NGCP/ SURNECO)
